RISK ASSESSMENTS & SAFE WORKING PRACTICES

View only files, for further information please contact CDI Group plc.

 

01a Working At Height – Step Ladders

01b Working At Height – Ladders

01c Working At Height – Podiums

01d Working At Height – Powered Access

01e Working At Height – Access Towers

02 Fire Retardant Foam

03 Cleaning

04 Intumescent Mastic Use

05 Noise

06 Lone Working

07 Use Of Power Tools

07a HAV’s

07b HAV’s Safety Chart

08 Working Above False Ceilings

09 Working Hours

10 Electrical Installation Work

11 Asbestos

12 Manual Handling

13 Delivery And Installation Of Cabinets

14 Falling Debris Materials

15 Cabling In UG Ducts

16 Drilling And Adjacent Services External

17 Travel And Driving

17b Travel And Driving to Site

18 Cleanliness

19 Fixings General

20 Works Near Munitions

 

21 Access Holes

22 Small Hand Tools

23 Cabling From Boxes

24 Fibre Optic Cabling

25 Cabling From Drums

26 Overhead Works - Catinary Wires

27 Cabling Through Raised Floors

29 Earth Bonding

30 Cabling In Lofts

31 Use Of Extension Leads And Chargers

32 Confined Spaces

33 Termination And Testing Of Copper Cables

34a Installing Conduit - Flexible

34b Installing Conduit

35 Cabling In Conduit

36 Installing Trunking

37 Cabling In Trunking

38 Installing Cable Tray and Basket

39 Cabling On Tray And Basket

40 Clipping Cleating Cable Base Fixings

41 Cabling Through Raised Floor Voids

42 Outside Works

43 Stress In The Workplace

44 Alcohol and Drugs

51 Diamond Drilling

 
 
BACK TO CDI MAIN PAGE Tel: 0121 458 4888 | Email: information@cdigroup.co.uk